__Jean Le Nair - Naval
Architect
| |
_Significant
Projects |
SHAH
DENIZ- TRANSPORT & INSTALLATION (2005) |
||||
AKPO FPSO BASIC DESIGN (2003) |
||||
|
||||
CABLE SHIPS CONVERSIONS (2000-2001)
Assignement : Assistant to project manager Scope of work : - bid management (2x25M$) - drafting of the conversion specification - consultation / Specification & purchasing of LLI - engineering coordination & control - coordination with cable and ROV operators - drawing and calculation notes approval - ship conversion follow-up during 3 months in Gdansk (Poland) image : converted ship |
||||
MONACO HARBOUR
EXTENSION (2000) |
||||
GIRASSOL FPSO NEWBUILDING
(1998-1999) Assignement : Naval Architect Scope of work : - risk analysis linked to offloading operations - design and scantling of the FPSO bow protections - review and approbation of HHI calculation notes (hull scantling) - approbation of HHI scantling drawings - technical coordination for offloading terminal (subcontracted) image : FPSO completed, Ulsan |
||||
PRISA 101-102-103
NEWBUILT DRILLING BARGE (1997-1998) Assignement : Project manager for basic engineering Scope of work : - engineering team management - ABS approval coordination - technical management (GA, scantling, systems...) - planning and cost control - 5 month assistance to HALTER construction yard (Texas) image : Cantilever drill floor |
||||